The Civil Engineering
  • Home
  • All Posts
  • Construction
  • Estimating
  • Road Works
  • Asphalt
  • BBS
  • Civil 3D
  • Surveying
  • QA/QC
  • Videos

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

What's Hot

Civil Engineering Basic Knowledge – Every Engineer Must Know

July 22, 2023

Compound Wall Estimate Guide with Bar Bending Schedule

January 30, 2023

Flight of Stairs | How Many Flight of Stairs per Floor | Design Criteria

January 25, 2023
Facebook Twitter Instagram
Trending
  • Civil Engineering Basic Knowledge – Every Engineer Must Know
  • Compound Wall Estimate Guide with Bar Bending Schedule
  • Flight of Stairs | How Many Flight of Stairs per Floor | Design Criteria
  • How to Calculate Load on Footing for Structural Support
  • Calculate Bar Bending Schedule for One Way Slab
  • How to Calculate Quantity of Concrete Volume for Staircase
  • Dog Legged Staircase, Components & Design of Dog Legged Stair
  • Curing Concrete – How Long it Takes & How To Cure
The Civil EngineeringThe Civil Engineering
  • Home
  • All Posts
  • Construction
  • Estimating
  • Road Works
  • Asphalt
  • BBS
  • Civil 3D
  • Surveying
  • QA/QC
  • Videos
The Civil Engineering
Home » Method Statement for Concrete Repair Works | Structural Works
Construction

Method Statement for Concrete Repair Works | Structural Works

By Engr Waseem RajaJanuary 3, 20217 Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Method Statement for Concrete Repair Works | Structural Works | Repair of Concrete Cracks | Structural Concrete Repair | Steps for Concrete Damage Repair:

In this article we will discuss about Method Statement for Concrete Repair Works | Structural Works | Repair of Concrete Cracks | Structural Concrete Repair | Steps for Concrete Damage Repair.

PURPOSE:

The Main purpose of this Method Statement is to outline the repair procedure of strul concrete works for all building works in compliance with all the required specifications, standards, and proper construction procedures.

SCOPE OF WORK:

This document covers the work for the repair of structural concrete as follows:

  • Repair of structural conc. surface due to honeycomb, tie rod holes and other imperfections of concrete surface. (Sikatop 121).
  • Repair of structural conc. due to concrete surface cracking.( Sikadur 752/Sikadur 731)
  • Repair of structural conc. due to water leak.(Sika Top Seal 107).

WORK FLOW CHART:

Method Statement for Concrete Repair Works, Structural Works, Repair of Concrete Cracks, Structural Concrete Repair, Steps for Concrete Damage Repair
Work Flow Chart | Method Statement for Concrete Repair Works

OTHER POSTS:

  1. Method Statement for Pouring Concrete on Slab on Grade (S.O.G)

  2. Method Statement for Excavation Compaction and Backfilling | Civil Works

  3. Method Statement for Formwork, Reinforcement and Concrete Works


MAPPING:

A sketch of the surface defect shall be prepared indicating the location as reflected in the drawing. All surface defects shall be given ID number for easy reference.

SURFACE PREPARATION:

Surface preparation shall be done in accordance with the materials manufacturer’s recommendation as indicated in this method of statement, technical data sheet as per mentioned product.

DEFECT CATEGORY IDENTIFICATION AND TREATMENT METHOD:

After surface preparation of affected area, types of defects and classification of treatment shall be established as follows:

Method Statement for Concrete Repair Works, Structural Works, Repair of Concrete Cracks, Structural Concrete Repair, Steps for Concrete Damage Repair

Method Statement for Concrete Repair Works, Structural Works, Repair of Concrete Cracks, Structural Concrete Repair, Steps for Concrete Damage Repair
Method Statement for Concrete Repair Works, Structural Works, Repair of Concrete Cracks, Steps for Concrete Damage Repair

TREATMENT APPLICATION:

Mixing, application and curing shall be done in accordance with the manufacturer’s recommendation as indicated in this method of statement.

EQUIPMENT TO BE USED:

SAFETY CONTROL:

Prior to commencement of the works, we will ensure that technical specifications of each product was carefully carried out to avoid any problem at site.

Personal Protective Equipment:

  • All required PPE such as helmet and safety shoes shall be provided and maintained for all workers doing the repair works.
  • For the porpose of protecting workers eye injury and flying particles, eye protector such as safety glass,face shield and goggles shall be provided engaged in the related work.
  • Mask and rubber gloves are required to workers involved in mixing and application as per MSDS requirements.

Barricades, signs and Materials to be used:

  • Safety and warning signboards in dual language shall be installed.
  • Barricades shall be erected to isolate the working area with suitable and sufficient access.
  • Materials required for this work shall be properly stored and identified at areas designated for this purpose.
  • All Scaffolding to be used, if any shall be inspected prior to use.

SIKA PRODUCTS:

  • Sika Monotop 615HB
  • Sika Monotop R
  • Sikadur 731
  • Sikadur 752
  • Sika seal 107

Note: You can download the above product technical data sheets on sika official website.

Conclusion:

Full article on Method Statement for Concrete Repair Works | Structural Works | Repair of Concrete Cracks | Steps for Concrete Damage Repair. Thank you for the full reading of this article in “The Civil Engineering” platform in English. If you find this post helpful, then help others by sharing it on social media. If you have any question regarding article please tell me in comments.

Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
Previous ArticleMethod Statement for Formwork, Reinforcement and Concrete Works
Next Article Method Statement for Excavation Compaction and Backfilling | Civil Works
Engr Waseem Raja
  • Website
  • Facebook
  • Twitter
  • Instagram
  • LinkedIn

Hi! Welcome to my blog. My name is Engr Waseem Raja and I’m the author of TheCivilEngineerings.com. I am a Civil Engineer by profession but I’ve specialized and taken the journey in the field of Quality Engineering. I’ve worked as a Quality Engineer & Manager in the well-known companies in the Gulf region for almost Ten years.

Related Posts

Civil Engineering Basic Knowledge – Every Engineer Must Know

July 22, 2023

Compound Wall Estimate Guide with Bar Bending Schedule

January 30, 2023

How to Calculate Load on Footing for Structural Support

January 14, 2023

Calculate Bar Bending Schedule for One Way Slab

August 13, 2022

How to Calculate Quantity of Concrete Volume for Staircase

July 26, 2022

Dog Legged Staircase, Components & Design of Dog Legged Stair

July 23, 2022

7 Comments

  1. Mohammad Mehdi Farahani on June 26, 2020 7:16 am

    How Can I Download This File?

    Reply
  2. Waqas on May 7, 2022 7:30 am

    Nice keep it up

    Reply
    • Engr Waseem Raja on May 8, 2022 11:57 pm

      Thanks for the comments please visit more articles by clicking on “All Posts” tab of the Menu Bar

      Reply
  3. Bikash Pradhan on August 30, 2022 5:53 pm

    Thanks for Sharing, Plese share the method statement for repairing exposed reinforced Concrete in PDF/Word file.

    Reply
    • Engr Waseem Raja on September 3, 2022 7:20 am

      Thanks for the comments please visit more articles by clicking on “All Posts” tab of the Menu Bar

      Reply
  4. Adugna on September 1, 2022 9:37 pm

    Thanks Engineer keep it up

    Reply
    • Engr Waseem Raja on September 3, 2022 7:19 am

      Thanks for the comments please visit more articles by clicking on “All Posts” tab of the Menu Bar

      Reply

Leave A Reply Cancel Reply

Top Posts

51 Most Important Points | A Civil Engineer Must Know | Basic Knowledge

August 9, 2021

Flight of Stairs | How Many Flight of Stairs per Floor | Design Criteria

January 25, 2023

Checklist for Slab Reinforcement While Casting

February 13, 2022
Most Popular

51 Most Important Points | A Civil Engineer Must Know | Basic Knowledge

August 9, 202186 Views

Flight of Stairs | How Many Flight of Stairs per Floor | Design Criteria

January 25, 202375 Views

Checklist for Slab Reinforcement While Casting

February 13, 202269 Views

Subscribe to Updates

Get the latest creative news from FooBar about art, design and business.

Recent Posts
  • Civil Engineering Basic Knowledge – Every Engineer Must Know
  • Compound Wall Estimate Guide with Bar Bending Schedule
  • Flight of Stairs | How Many Flight of Stairs per Floor | Design Criteria
  • How to Calculate Load on Footing for Structural Support
  • Calculate Bar Bending Schedule for One Way Slab
  • How to Calculate Quantity of Concrete Volume for Staircase
The Civil Engineering
Facebook Twitter Instagram Pinterest YouTube Tumblr LinkedIn Reddit TikTok VKontakte RSS
  • About Us
  • Disclaimer
  • Privacy Policy
  • Terms and Conditions
  • Contact
© 2025 The Civil Engineering. All Rights Reserved

Type above and press Enter to search. Press Esc to cancel.